Home | Plumbing Services | Past Projects 2008 | Past Projects 2009 | Commercial Work | Testimonials | Contact | Ceiling Replacements | Renovation Projects

McBride Decorators

Plumbing Services

The McBride Decorators plumbing service works with Clients to offer cost effective solutions where costs need to be kept to a minimal at this difficult financial time.

We guarantee to beat any other quotation obtained from a reputable plumbing company without compromising on quality.

Simple & effective bathroom solutions

GeorgeIV_BEFORE.jpg
Bathroom BEFORE Work

Complete Bathroom Renovations

Bathroom_Before_Work1.jpg
Bathroom BEFORE Work

Bathroom_During_Work1.jpg
Bathroom DURING work

Bathroom_After_Work2.jpg
Bathroom AFTER work

Bathroom_After_Work4.jpg
Bathroom AFTER work

 
 
 
 
 
Refurbishment of a small cloakroom toilet in Morningside, Edinburgh

Toilet_Before_Work_May2009.jpg
Toilet BEFORE work

Complete Refurbishment Services Available.
 
The following project involved rebuilding a shower room which suffered from a bad dampness & timber rot problem.
 
The room was stripped out to a shell and treated for dampness.
New plasterboard ceiling, new wall timbers and plasterboard walls installed before being tiled.  
 
New Shower Cabinet and electric shower fitted. New toilet, wash hand basin and heated chrome towel rail.
 
New Tiled floor layed onto a new solid concrete floor.

ShowerRoom_BEFORE1.jpg
Shower Room BEFORE work, partially stripped out

ShowerRoom_BEFORE2.jpg
Shower Room BEFORE old floor being stripped out

November 2009 - Bathroom Refurbishment Project. Removal of a traditional bathroom suite and replacement with Quadrant Shower Tray & Cabinet and Power Shower. Bathroom fully tiled (walls and floor).

BAILO_BEFORE_1.jpg
Bathroom Before Work
BAILO_BEFORE_2.jpg
Area BEFORE Work
BAILO_BEFORE_3.jpg
Bulkhead area BEFORE Work.
BAILO_BEFORE_4.jpg
Main wall BEFORE work

The Installation of a Bristan Shower
(Running off an Alpha Combination gas boiler)

GeorgeIV_Bridge_015.jpg
Bathroom AFTER Work

All Trades supplied to ensure a first class job.

Bathroom_Before_Work2.jpg
Bathroom BEFORE work

Bathroom_During_Work3.jpg
Bathroom DURING work

Bathroom_After_Work1.jpg
Bathroom AFTER work

Bathroom_After_work3.jpg
Bathroom AFTER work

Toilet_After_Work_May2009.jpg
Toilet AFTER work

ShowerRoom_AFTER1.jpg
New Shower Cabinet, shower tray and Mira Shower

ShowerRoom_AFTER2.jpg
New toilet, wash hand basin and tiled floor

ShowerRoom_AFTER3.jpg
New chrome heated towel rail fitted to new tiled walls

McBride Decorators worked with the Client and their independent bathroom designer to provide a fitting service to complete the work to a high standard.

Bailo_Finished_Job_3.jpg
Bathroom AFTER work
Bailo_Finished_Job_1.jpg
Area AFTER new Quadrant Shower tray, cabinet and power shower fitted
Bailo_Finished_Job_2.jpg
Bulkhead area AFTER work
Bailo_Finished_Job_5.jpg
Main wall AFTER work

OVER 40 Years Experience Goes Into Every Work Project